MOBARAKEH STEEL COMPLEX, ISFAHAN - IRAN
DIRECT REDUCTION PLANT- MODULE "F"
| IRITEC'S SERVICES: |
|
|

|
- Conceptual and Basic Design
- Detail Engineering
- Procurement
- Inspection
- Project Planning & Control
- Construction & Commissioning
- Supervision & Monitoring
|
Within Mobarakeh Steel Complex expansion plan, it was
decided to add a direct reduction module for increasing the sponge iron production
capacity by 800,000 tpy.
The project named "Module F Project" is carried out by IRITEC.
The total weight of equipment adds up to 8000 tons and to maximize the utilization of
existing facilities, it is adjacent to existing modules.
More than 50% of the equipment are manufactured in Iran.
MOBARAKEH
STEEL COMPLEX, ISFAHAN - IRAN
INCREASING THE HOT STRIP ROLLING MILL CAPACITY
| IRITEC'S SERVICES: |
|
|

|
-
Turnkey
Basis
-
Project
Management
-
Engineering
-
Procurement
-
Construction
-
Commissioning and
Performance Tests
|
This project consists of design and installation of a
new rolling mill stand (F7) and necessary modification on existing stands (F5 & F6)
with the target of increasing the production capacity of the plant from 2,400,000
tpy up
to 3,200,000 tpy.
The execution of the project took 28 months long and completed successfully in Nov. 1998,
and now is under operation.
All activities were carried out concurrently with the continuous production of the
plant.
IRITEC's partners : IRASCO, IRISA and INSSE .
MOBARAKEH STEEL COMPLEX, ISFAHAN - IRAN
LADLE FURNACE PLANT
| IRITEC'S SERVICES: |
|
|

|
- Turnkey Basis
- Project Management
- Engineering
- Procurement
- Construction
- Commissioning and
Performance Tests
|
In
the light of M.S.C techno-economical study for development of the plant, it was decided to
add a Ladle Furnace Plant inside the existing Steel Making Plant.
The main aim of adding this plant:
Increasing the capacity
of steel making up to 600,000 tpy of slag free and producing clean steel.
Decreasing tap-to-tap
time and saving energy.
Substitution of chemical
energy vs electrical energy by utilizing oxy-natural gas graphite lance.
The
main added equipment consist of 4 ladle furnaces, changing the existing
8 arc-furnaces tapping mechanism to E.B.T, Oxygen-Natural Gas lancing,
and Argon blowing.
All activities were carried out concurrently with the continuous production of the plant.
The plant was completed successfully in May 1999 and now is under operation.
MOBARAKEH STEEL
COMPLEX, ISFAHAN - IRAN
SLAB COOLING AND CONDITIONING PLANT
| IRITEC'S SERVICES: |
|
|

|
- Basic and Detail Design
- Supply of Equipment
- Construction and
Supervision Management
|
This plant receives hot slabs with a temperature of
about 1000 °c from the continuous casting machines. For cooling the hot slabs, water
& air cooling systems are used.
In water cooling system the slabs are submerged into two slab cooling tanks, and cooled up
to 80 °c and in air cooling system , slabs are stored in air cooling open area and
naturally cooled up to the ambient temperature.
The total weight of installed equipment adds up 10,000 tons , and the plant consists of
seven E.O.T. cranes of 40 tons capacity each, three cooling towers and a deducting system.
The three-covered bay plant stretches as much as 30,000 m2.
The plant commissioned successfully in 1992 and now is under operation.
MOBARAKEH STEEL
COMPLEX, ISFAHAN - IRAN
2 x 310 T/H SLAB REHEATING FURNACES
| IRITEC'S SERVICES: |
|
|

|
- Basic and Detail Design
- Supply of Equipments
- Overall Project
Monitoring
- Construction Management
and Supervision
- Commissioning of the
Plant
|
Based on feasibility study for expansion of Mobarakeh
Steel Complex, two 310 t/h slab reheating furnaces were installed and commissioned in the
hot strip rolling mill of Mobarakeh steel complex.
By installation of these two furnaces, four furnaces are now available .
The first furnace was installed and commissioned in Nov. 1999 and by connection of the
first furnace to the production line, the capacity of the hot strip mill increased
from 2,400,000 tpy to 3,200,000 tpy.
The second furnace was installed and commissioned in March 2000.
The installation of the furnaces was being carried out without any interruption of the
on-going production line.
These are further the modification of the hot strip rolling mill stand R3 and the coilers
to achieve the target production of 4,200,000 tpy.
|